五月综合激情婷婷六月色窝-日本最大色倩网站www-欧美成人片在线观看-国产香蕉视频在线播放-久久丫精品系列

?巖棉板生產(chǎn)廠家外墻保溫施工技術(shù)

巖棉板制造商的外墻保溫施工過(guò)程主要包括:基礎(chǔ)處理,膠粘劑配置,固定裝置,底部抹灰砂漿,耐堿網(wǎng)眼布,表面抹灰砂漿,保溫系統(tǒng)驗(yàn)收和裝飾層施工。我們的齊工巖棉板廠家今天要談?wù)摰氖钦迟N巖棉板的過(guò)程。

?巖棉板生產(chǎn)廠家外墻保溫施工技術(shù)
 
The external wall insulation construction process of rock wool board manufacturer mainly includes: foundation treatment, adhesive configuration, fixing device, bottom plastering mortar, alkali resistant mesh cloth, surface plastering mortar, insulation system acceptance and decorative layer construction. Our Qinghai rock wool board manufacturers today to talk about the process of sticking rock wool board.
 
齊工巖棉板
 
1.粘貼時(shí),從底部到頂部用粘結(jié)砂漿鋪砌巖棉板。巖棉板的長(zhǎng)邊在水平方向上放置和粘貼。垂直接縫應(yīng)逐行錯(cuò)開(kāi)1/2線,且板長(zhǎng)等于或大于200mm。
 
1. When sticking, place rock wool board from bottom to top with binding mortar. The long sides of the rock wool board are placed and pasted in a horizontal direction. The vertical joints shall be staggered 1/2 line by line and the length of the plate shall be equal to or greater than 200mm.
 
2.墻角兩側(cè)的巖棉板應(yīng)錯(cuò)開(kāi)重疊,并應(yīng)確保墻角的垂直性。
 
2. The rock wool boards on both sides of the corner shall be staggered and overlapped, and the perpendicularity of the corner shall be ensured.
 
3.開(kāi)口(如門窗)的四個(gè)角應(yīng)切成整塊巖棉板,不要拼接。巖棉板的接縫與開(kāi)孔四個(gè)角之間的距離應(yīng)大于200mm,開(kāi)口四側(cè)其他巖棉板的寬度應(yīng)不小于200mm。
 
3. The four corners of openings (such as doors and Windows) should be cut into a whole rock wool board, do not join. The distance between the joint of the rock wool board and the four corners of the opening shall be greater than 200mm, and the width of the other rock wool board on the four sides of the opening shall be no less than 200mm.
 
4.均勻地按壓巖棉板,使其完全粘附在基礎(chǔ)層上。粘結(jié)砂漿的壓實(shí)厚度盡量控制在3mm之內(nèi)。
 
4. Press the rock wool board evenly to make it adhere to the base layer completely. The compaction thickness of bonding mortar should be controlled within 3mm as far as possible.
 
5.隨時(shí)使用2m斜尺和電線支架檢查平面度和垂直度,如果不符合要求,請(qǐng)立即進(jìn)行校正。
 
5. Use 2m inclined scale and wire bracket to check the flatness and perpendicularity at any time. If it does not meet the requirements, please correct it immediately.
 
6.立即刮下板縫和板側(cè)面之間的殘留砂漿。
 
6. Immediately scrape off the residual mortar between the seams and the sides of the board.
 
7.巖棉板之間的間隙應(yīng)控制在1.5mm之內(nèi),接頭之間的高度差應(yīng)控制在1mm之內(nèi)。如果接頭的寬度超過(guò)1.5毫米,則可用適當(dāng)寬度的巖棉板條填滿縫隙,注意不要讓板條粘住。
 
7. The gap between rock wool boards should be controlled within 1.5mm, and the height difference between joints should be controlled within 1mm. If the width of the joint exceeds 1.5 mm, rock wool slats of appropriate width may be used to fill the gap, taking care not to allow the slats to stick.
 
另外,請(qǐng)關(guān)注生產(chǎn)巖棉板的廠家官方網(wǎng)站,以了解更多有關(guān)齊工巖棉條產(chǎn)品的信息。您可以直接聯(lián)系在線客服或留言,我們將竭誠(chéng)為您提供更好的服務(wù)!
 
免責(zé)聲明:本網(wǎng)站上的某些文章和圖片來(lái)自Internet,僅供參考。版權(quán)屬于原始作者。如果您的權(quán)利受到侵犯,請(qǐng)與我們聯(lián)系,我們將盡快處理。

上一篇:有關(guān)巖棉板生產(chǎn)企業(yè)的四大應(yīng)用領(lǐng)域詳解

下一篇:使用巖棉板時(shí)應(yīng)注意的事項(xiàng)

主站蜘蛛池模板: 成人精品视频一区二区| 國产一二三内射在线看片| 国产偷窥熟女精品视频| 亚洲人成77777在线播放网站不卡| 日韩精品内射视频免费观看| 国产亚洲精品久久久久的角色| 女人自慰疯狂喷水| 国产ww久久久久久久久久| 无码av一区二区大桥久未 | 欲香欲色天天天综合和网| 国产成人午夜精品福利视频| 久久久久99精品成人片三人毛片| 欧美放荡的少妇| 亚洲老熟女与小伙bbwtv| 国产精品福利2020久久 | 欧美日韩精品一区二区三区在线 | 成 人 在 线 免费观看| 国产精品久久久爽爽爽麻豆色哟哟 | 国产精品人妻一码二码尿失禁| 最爽无遮挡行房视频| 久久er99热精品一区二区| 日韩精品无码不卡无码| 在线精品无码字幕无码av| 国产精品成人无码免费| 国产又爽又猛又粗的视频a片| 亚洲乱色熟女一区二区三区麻豆 | 亚洲国产精品久久一线不卡| 成人综合婷婷国产精品久久蜜臀| 成人午夜亚洲精品无码区毛片| 国产色婷婷五月精品综合在线| 国产成人小视频| 4438xx亚洲最大五色丁香| 亚洲人成网站色7799| 黑人av| 天堂а√中文在线官网| 欧美人妻aⅴ中文字幕| 无码一区二区三区av免费 | 亚洲精品久久久久久久蜜桃臀 | 极品少妇被啪到呻吟喷水| 久久精品无码一区二区小草| 人妻在卧室被老板疯狂进入|